Title Interior Cost Estimating as a Design Marketing Tool - for Executive Office Interior
Authors 이혜연
Page pp.68-73
ISSN 12297992
Keywords 인테리어 공사비의 초기 예측기법 ; 부분별 공사분류 ; 구성형태 및 마감재에 따른 공사비 예측기법 ; CMRES
Abstract The purpose of this research is to develop interior construction cost-estimating system at the early stage of the project. Though general construction estimates are typically in quantitative, interior construction should be in rather qualitative. Therefore, design-concerned cost-estimating methods should be developed to manage interior projects from the early stage. 30 estimates of VIP-Zone interior projects, were examined to develop the general type of composition and material classification. The cost has been classified by construction parts such as wall, ceiling, floor, and doors & windows and their treatments. The composition and material related estimating system (CMRES) was consisted of the unit average costs of classification and the variation coefficients. The CMRES was verified by the case study, and the results showed that the difference between the actual estimate and the CMRES was competitively confident.