The Journal of
the Korean Institute of Interior Design

The Journal of
the Korean Institute of Interior Design

Bimonthly
  • ISSN : 1229-7992(Print)
  • ISSN : 2733-6832(Online)
  • KCI Accredited Journal

Editorial Office

  • Tel. +82-2-564-2598
  • Fax. +82-2-564-2599
  • E-mail. kiid@kiid.or.kr
Title A Study on the Theater Construction of Stage System and Conversion System
Authors 김종성 ; 이성원 ; 임채진
Page pp.195-202
ISSN 12297992
Keywords 공연장 ; 무대장치 ; 전환시스템
Abstract The stage facilities in the western culture originates in the scientifically planned Open Air Theater built in BC 3C and magnificent theaters built in the era of Rome. These buildings are the remains that reveal popularization of the play. Furthermore, the facilities continued to flourish in the medieval to the Industrial Revolution as stage art actualizing designers' imagination. Diverse systems developed in industrial technology have been transferred to the stage, and the balance between industrial and cultural art has been endeavored to be achieved.
The conversion methods of the stage has been developing in various forms. Domestic stage setting arrangement techniques and material exploitation have also been developing. Therefore, in reality, it is very difficult to grasp the definite trend. Additionally, as for the stage system in Korea, plays are dependently directed by directors and stage artists. It is concluded that the current state should be understood based on actual examples to meet solve these problems.
The purpose of the study is to provide basic data for stage facilities planning. To do this, how the stage system of large performance halls can be used in accordance with performance condition of the grounds in Korea and frequent scene changes is given a special attention. With this background, the surroundings of the stage and conversion system are examined.