(1994), Anchorage Zone Reinforcement for Post-Tensioned Concrete Girders, National
Cooperative Highway Research Program Report 356, 8-11.
(2013), Study on the Load Transfer Capacity of Circular Anchorage for Prestressed
Concrete, Ph.D. dissertation
(2001), Minimization of Bursting Force at Anchorage Zone Using Prestressing Order
for PSC Box Girder Bridge, Journal of the Korea Institute for Structural Maintenance
and Inspection. KSMI, 5(2), 103-109.
(2011), European Technical Approval ETA-06/0022, 21-45.
(2010), Freyssinet Prestressing, 7-13.
(1953), Prestressed Concrete
(1966), A Three Dimensional Stress Distribution Problem in the Anchorage Zone of
a Post-Tensioned Concrete Beam, Magazine of Concrete Research, 18(55), 75-88.
(2010), Detail Analysis of PSC Beam Anchorage, Master dissertation, 46-58.
(1973), Das Bewehren von Stahlbetontragwerken
(1994), Anchorage Zone Behavior and Analysis of Precast Prestressed Concrete Box-Girder
Bridges, Ph.D. dissertation
(1924), Über die Berechnung der Gelenkquader, B ton-und Eisen, 12, 156-161.
(1997), Stress Distribution and Cracking Behavior at Anchorage Zone in Prestressed
Concrete Members, ACI structural journal. ACI, 94(5), 549-557.
(2012), Post-Tensioning System, 7-15.
(1981), Behavior of Post-tensioned Girder Anchorage Zones, 73-81.