(2000), A study on the selection process for the construction method in sheathing
work, Master's thesis
(2008), Selection of Retaining Wall System for Underground Parking Lots Expansion
of Apartments, J. Constr. Eng. Manage, 9(2), 99-107.
(2014), A case study of Foundation Construction Method (SAP Method), Journal of Korean
Geosynthetics Society, 13(3), 6-14.
(2011), Environmental foundation reinforcement method of existing structure / PR
Pressure Penetrating Pile, Journal of Korean structural Engineers Association, 18(5),
57-64.
(2009), The Development of a Model for Selecting Method of Entry for Apartment in
Remodeling an Underground Parking Lot, Korean journal of construction engineering
and management, 10(2), 65-74.
(2012), SAP construction method apartment and factory renovation foundation reinforcement
case, Journal of Korean structural Engineers Association, 19(5), 69-77.
(2016), Research on the Representative Types of Aged Apartments in the 1st-Phase
New Town for Remodeling, Journal of the Architectural Institute of Korea Structure
& Construction, 33-40.
(2007), The Development of Procedure Model for Selecting the Method of Parking Lot
Expansion in Apartment Complex, Journal of the Architectural Institute of Korea Structure
& Construction, 23(2), 151-160.
(2004), A study on the Knowledge based Selection Process for Proper Construction
Method of the Underground Construction Phase, Journal of the Architectural Institute
of Korea Structure & Construction, 24(2), 639-642.
(2015), A Study on Feasibility Analysis of Each Way of Fundamental Reinforcement
Method in Vertical Extension of an Apartment, Korea Journal of Construction Engineering
and Management, 10, 142-146.
(2014), A Study on the Basement Extension Construction Method Using Existing Piles,
Journal of the Architectural Institute of Korea Structure & Construction, 317-322.
(2013), Journal of civil engineering, 61(4), 66-68.
(2013), Screw attached to a small-caliber steel pipe piles(SAP), Magazine of the
Korea Concrete Institute, 24(3), 43-47.
(2001), A Study on the Selection of Construction Method by Risk Factor Analysis -
Focused on Underground Construction Work
(2004), A Neural Network Model for Selecting a Piling Method of Building Construction,
J. Constr. Eng. Manage, 317-322.