• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Korea Power Exchange, Electric Power Statistics Information System (EPSIS), 2025. [Online]. Available:https://epsis.kpx.or.kr/, Accessed: 2025.URL
2 
T. Lee and Y. Lee, “Expansion of renewable energy in Jeju Island and direction for stable operation of the power system,” Energy Focus, Korea Energy Economics Institute (KEEI), 2020 Winter issue, pp. 48–63, 2021.URL
3 
South Korea Ministry of Trade, Industry and Energy, The 10th Basic Plan for Long-term Electricity Supply and Demand, 2023.URL
4 
ABB, “South Korea island turns to ABB technology to stabilize its power grid in the transition to renewables,” ABB Newsroom, Apr. 23, 2024. [Online]. Available: https://new.abb.com/news/detail/112439URL
5 
Y. Shin, S. Kim, J. Na, J, Kang and K. Hur, “Comparison of black start resources in JEJU CFI(Carbon Free Island) power system,” in Proc. KIEE Summer Conf., Korean Institute of Electrical Engineers, Jeju, Korea, pp. 59–60, Jul. 2024.URL
6 
Bundesnetzagentur, Network Development Plan 2037/2045, German Federal Network Agency, 2023.URL
7 
AEMO, Engineering Roadmap to System Security: Transition Plan, Australian Energy Market Operator, 2024.URL
8 
IEEE, “IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems,” IEEE Std 2800-2022, 2022. DOI:10.1109/IEEESTD.2022.9762253DOI
9 
Siemens PTI, PSS®E Model Library Manual, 2023.URL
10 
PowerWorld Corporation, PowerWorld Simulator Model Library, 2023.URL
11 
UNIFI Consortium, “Virtual synchronous machine grid-forming inverter model specification,” UNIFI Technical Specification, 2024. [Online]. Available: https://www.unifi.energyURL
12 
Electric Power Research Institute (EPRI), “Verification of the generic model for inertial-based fast frequency response of wind turbine generators,” EPRI Report, no. 3002016200, 2019.URL
13 
ENTSO-E, “FFR design of requirements – External document,” European Network of Transmission System Operators for Electricity, 2020. [Online]. Available: https://www.entsoe.euDOI
14 
Korea Power Exchange (KPX), “Operational strategy for Jeju grid in 2024 with the introduction of the #3 HVDC,” Internal Technical Report, 2024.URL