• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
S. Zhang and W. Chen, “China's Energy Transition Pathway in a Carbon Neutral Vision,” Engineering, vol. 14, pp. 64~76, 2022. DOI:10.1016/j.eng.2021.09.004DOI
2 
Ministry of Trade, Industry and Energy, Renewable Energy 3020 Implementation Plan (Draft), December 2017.URL
3 
K. Jung, A Study on the Linkage Plan between Emissions Trading System and Renewable Portfolio Standard, Korea Energy Economics Institute, 2010.URL
4 
H. Kim, G. Yang, C. Nam, S. Jeong and S. P. Jung, “Solar Photovoltaic Industry in Korea: Current Status and Perspectives,” Journal of Korean Society of Environmental Engineers, vol. 45, no. 2, pp. 107~118, 2023.URL
5 
A. Kaur, L. Nonnenmacher and C. F. M. Coimbra, “Net load forecasting for high renewable energy penetration grids,” Energy, vol. 114, pp. 1073~1084, 2016. DOI:10.1016/j.energy.2016.08.067DOI
6 
Y. Wang, N. Zhang, Q. Chen, D. S. Kirschen, P. Li and Q. Xia, “Data-Driven Probabilistic Net Load Forecasting With High Penetration of Behind-the-Meter PV,” IEEE Transactions on Power Systems, vol. 33, no. 3, pp. 3255~3264, May 2018. DOI:10.1109/TPWRS.2017.2762599URL
7 
Q. Zhang, S. Zhou, B. Xu and X. Li, “TCAMS-Trans: Efficient temporal-channel attention multi-scale transformer for net load forecasting,” Computers and Electrical Engineering, vol. 118, part B, 109415, 2024. DOI:10.1016/j.compeleceng.2024.109415URL
8 
S. M. Lee, S. i. Hur, H. J. Park and H. G. Son, “A Study on the Estimation of Behind-The-Meter Solar Power Capacity by Country and Region for Predicting Total Load,” Proceedings of the Korean Institute of Electrical Engineers Conference, pp. 469~470, 2024.URL
9 
H. Shin and J. B. Park, “Analysis of Global RE100 Operation Status and Suggestions for Expanding RE100 in South Korea,” The transactions of The Korean Institute of Electrical Engineers, vol. 70, no. 11, pp. 1645~1654, 2021. DOI:10.5370/KIEE.2021.70.11.1645DOI
10 
Electricity Market Operation Rules, Korea Power Exchange, 2024.URL
11 
EPSIS Electric Power Statistics Information System, “Electric Power Supply and Demand Forecast Information,” Korea Power Exchange, Accessed December 31, 2024.URL
12 
J. M. Mun, S. i. Hur and H. G. Son, “A Study on Non-metered Solar Power Generation Estimation and DB Construction for Predicting Total Electricity Load,” Proceedings of the Korean Institute of Electrical Engineers Conference, pp. 264~265, 2023.URL
13 
H. K. Firozjaei, M. K. Firozjaei, O. Nematollahi, M. Kiavarz and S. K. Alavipanah, “On the effect of geographical, topographic and climatic conditions on feed-in tariff optimization for solar photovoltaic electricity generation: A case study in Iran,” Renewable Energy, vol. 153, pp. 430~439, 2020. DOI:10.1016/j.renene.2020.01.127DOI
14 
D. J. Bae, B. S. Kwon, C. H. Moon, S. H. Woo and K. B. Song, “Short-Term Load Forecasting Algorithm on Weekdays considering the Amount of Behind-the-Meter Generation,” Journal of the Korean Institute of Illuminating and Electrical Installation Engineers, vol. 34, no. 11, pp. 37~43, 2020. DOI:10.5207/JIEIE.2020.34.11.037DOI
15 
F. Wang, X. Ge, Z. Dong, J. Yan, K. Li and F. Xu, “Joint Energy Disaggregation of Behind-the-Meter PV and Battery Storage: A Contextually Supervised Source Separation Approach,” IEEE Transactions on Industry Applications, vol. 58, no. 2, pp. 1490~1501, Mar.–Apr. 2022. DOI:10.1109/TIA.2022.3144244DOI
16 
F. Bu, R. Cheng and Z. Wang, “A Two-Layer Approach for Estimating Behind-the-Meter PV Generation Using Smart Meter Data,” IEEE Transactions on Power Systems, vol. 38, no. 1, pp. 885~896, Jan. 2023. DOI:10.1109/TPWRS.2022.3164010DOI
17 
Public Data Portal, Korea Power Exchange_Renewable Energy-linked ESS Facility Capacity Data, Accessed December 31, 2024.URL
18 
S. Abdelrazek and S. Kamalasadan, “A Weather-Based Optimal Storage Management Algorithm for PV Capacity Firming,” IEEE Transactions on Industry Applications, vol. 52, no. 6, pp. 5175~5184, Nov.–Dec. 2016. DOI:10.1109/TIA.2016.2598139DOI
19 
Public Data Portal, Korea Power Exchange_Regional Hourly Solar and Wind Power Generation, Accessed December 31, 2024.URL
20 
B. O. Kang, B. G. Hwang, K. Kwon and J. Jung, “Operational Strategy of Energy Storage System (ESS) to Participate in Demand Response (DR) Market for Industrial Customer,” New & Renewable Energy, vol. 13, no. 2, pp. 4~12, 2017. DOI:10.7849/ksnre.2017.6.13.2.004DOI
21 
Korea Meteorological Administration Weather Nuri, Historical Observations, Accessed December 31, 2024.URL