• 대한전기학회
Mobile QR Code QR CODE : The Transactions of the Korean Institute of Electrical Engineers
  • COPE
  • kcse
  • 한국과학기술단체총연합회
  • 한국학술지인용색인
  • Scopus
  • crossref
  • orcid

References

1 
Y. Song, "Review of Perspectives on Pantograph-Catenary Interaction Research for High-Speed Railways Operating at 400 km/h and Above," Civil-Comp Press, Edinburgh, UK, Proc. 6th Int. Conf. Railway Technology: Research, Development and Maintenance, 2024. Paper 4.12 Google Search
2 
Y. Song, X. Lu, Y. Yin, Y. Liu, Z. Liu, "Optimization of Railway Pantograph-Catenary Systems for over 350 km/h Based on an Experimentally Validated Model," IEEE Transactions on Industrial Informatics, vol. 20, no. 5, pp. 7654-7664, 2024. DOI
3 
S. Bruni, G. Bucca, M. Carnevale, A. Collina, A. Facchinetti, "Pantograph-Catenary Interaction: Recent Achievements and Future Research Challenges," International Journal of Rail Transportation, vol. 6, no. 2, pp. 57-82, 2018. DOI
4 
J.-W. Kim, H.-C. Chae, B.-S. Park, S.-Y. Lee, C.-S. Han, J.-H. Jang, "State Sensitivity Analysis of the Pantograph System for a High-Speed Rail Vehicle Considering Span Length and Static Uplift Force," Journal of Sound and Vibration, vol. 303, no. 3-5, pp. 405-427, 2007. DOI
5 
T.-J. Park, C.-S. Han, J.-H. Jang, "Dynamic Sensitivity Analysis for the Pantograph of a High-Speed Rail Vehicle," Journal of Sound and Vibration, vol. 266, no. 2, pp. 235-260, 2003. DOI
6 
"UIC 606-1 OR: Consequences of the Application of the Kinematic Gauges Defined by UIC Leaflets in the 505 Series on the Design of the Contact Lines," UIC, UIC, 1987. Google Search
7 
S.-Y. Kwon, "A Study on the Design Technology and Interface of Overhead Contact Line Systems (II): Analysis of Design Element Technologies and Performance Test Technologies for the High-Speed Railway Catenary System," Korea Railroad Research Institute, 1998. Research Report for the Korea High Speed Rail Construction Authority, Dec. Google Search
8 
S.-H. Chang, K.-W. Lee, H.-B. Ryoo, "Technique of Maximum Span Length Calculation for 350 km/h High Speed Catenary System," pp. 924-931, Proceedings of the Korean Society for Railway Conference, 2011. Google Search
9 
N. Zhou, W. Zhang, "Investigation on Dynamic Performance and Parameter Optimization Design of Pantograph and Catenary System," Finite Elements in Analysis and Design, vol. 47, no. 3, pp. 288-295, 2011. DOI
10 
Y. Song, Z. Liu, H. Wang, X. Lu, J. Zhang, "Nonlinear Analysis of Wind-Induced Vibration of High-Speed Railway Catenary and Its Influence on Pantograph-Catenary Interaction," Vehicle System Dynamics, vol. 54, no. 6, pp. 723-747, 2016. DOI
11 
M. Simarro, J. J. Castillo, J. A. Cabrera, S. Postigo, "Evaluation of the Influence of the Speed, Preload and Span Length on the Contact Forces in the Interaction between the Pantograph and the Overhead Conductor Rail," Engineering Structures, vol. 243, pp. 112678, 2021. DOI
12 
J. Gil, Y. Song, S. Gregori, M. Tur, A. Ronnquist, F. J. Fuenmayor, "Railway Catenary Optimization with Span Variability by an Iterative Optimization Algorithm for Large Numbers of Parameters," Engineering Structures, vol. 299, pp. 117090, 2024. DOI
13 
T. Xing, X. Wang, L. Pan, Y. Song, D. Zhang, Q. Yu, "Effect of Structural Parameters on Pantograph-Catenary Interaction Performance in High-Speed Railways," Infrastructures, vol. 11, no. 3, pp. 88, 2026. DOI
14 
G. Wu, K. Dong, Z. Xu, S. Xiao, W. Wei, H. Chen, J. Zhang, "Pantograph-Catenary Electrical Contact System of High-Speed Railways: Recent Progress, Challenges and Outlooks," Railway Engineering Science, vol. 30, no. 4, pp. 437-467, 2022. DOI
15 
"UIC 505-1 OR: Railway Transport Stock - Rolling Stock Construction Gauge," UIC, UIC, 1993. Google Search
16 
Y. Yun, K. Lee, J. Kim, S. Lee, S. Chang, "A Study on the Calculation Method of Maximum Span Length for Overhead Contact Lines," pp. 316-321, Proceedings of the KSR Autumn Conference, 2001. Google Search
17 
Kiwon Lee, "Development of an Overhead Contact Line System for a Maximum Operating Speed of 350 km/h (Detailed Design Study of the Overhead Contact Line System)," Korea Railroad Research Institute, 2011. Research Report for the Korea High Speed Rail Construction Authority, Dec. Google Search
18 
"EN 50318:2018 - Railway Applications: Validation of Simulation of the Dynamic Interaction between Pantograph and Overhead Contact Line," CENELEC, CENELEC, 2018. Google Search