Mobile QR Code QR CODE : The Transactions P of the Korean Institute of Electrical Engineers
The Transactions P of the Korean Institute of Electrical Engineers

Korean Journal of Air-Conditioning and Refrigeration Engineering

ISO Journal TitleTrans. P of KIEE
  • Indexed by
    Korea Citation Index(KCI)

References

1 
Jae-Hee Kim, Seog-Moon Oh, Soon-Heum Hong, 2005, An exploratory development of mathematical programming model for the railway conflict resolution problem on a single line track, Journal of the Korea Society for Railway, Vol. 8, No. 4, pp. 314-320Google Search
2 
http://www.chosun.com/site/data/html_dir/2017/03/14/201703 1400087.htmlGoogle Search
3 
B. Erol, M. Klemenz, T. Schlechte, 2008, A library for train timetabling problem, ZIB Report 08-19, pp. 1-12Google Search
4 
G. Caimi, 2007, Algorithmic decision support for train scheduling in a large and highly utilised railway network, PhD these, ETH ZurichGoogle Search
5 
P. Serafini, W. Ukovich, 1989, A model for periodic scheduling problem, SIAM Journal on Discrete Mathmatics, Vol. 2, No. 4, pp. 550-581Google Search
6 
A. Schrijver, A. Steenbeck, 1994, Timetable construction for railned, Technical report center for mathematics and computer scienceGoogle Search
7 
V Cacchiani, P Toth, 2012, Nominal and robust train timetabling problems, EJOR, Vol. 219, No. 3, pp. 727-737DOI
8 
C Liebchen, M Lübbecke, RH Möhring, Stillers, 2009, The concept of recoverable robustness, linear programming recover, and railway applications, In: Robust and online large-scale optimization. LNCS 5868, pp. 1-27DOI
9 
M Fischetti, D Salvagnin, A Zanette, 2009, Fast approaches to improve the robustness of a railway timetable, Trans Sci 43, pp. 321-335DOI
10 
L Kroon, 2009, The new dutch timetable : The OR revolution, Interfaces 39, pp. 6-17DOI
11 
ES Oliveira, 2001, Solving single-track railway scheduling problem using constraint programming, PHD thesisGoogle Search
12 
B Szpigel, 72, Optimal train scheduling on a single track railway, Operational Research, 72, Ross, M.(ed), North- Holland, Amsterdam, pp. 343-352DOI
13 
V. Cacchiani, A. Caprara, P. Toth, 2010, Scheduling extra freight train on railway network, Transportation Research Part B, Vol. 44, No. 2, pp. 215-231DOI
14 
R. Borndörfer, T. schlechte, 2007, Solving railway track allocation problems, OR, pp. 117-122DOI
15 
Samuel S, 2011, Simulating the effects of higher speed passenger train in single track freight networks, Proceedings of the Winter simulation conference, pp. 3684-3692DOI