A Study on the Scheduling Method of Multi-building Construction |
Abstract |
The purpose of process planning is to minimize the total duration of building construction.Multi-site scheduling method is one of the solutions of it. But, to use the Multi-site scheduling method, we must synchronize the time of each job.For this reason, Building Structure must be limited.In this paper, put into a formula to calculate the scheduling in the case of Multi-Building Construction without the limitation of the structure. Total duration is determined by the longest work and a cycle time, it is based on the first study (1). Thus this paper are studied with the view of observation under the condition of the process and the term of works that it is increased a team of the longest works. |