Title |
A Study on the Scheduling Optimization in Building Construction |
Abstract |
The purpose of this study is to develop a way to optimize the construction scheduling. With respect to the repetitive or non-repetitive nature of work, the building construction process can be classified into two different groups:repetitive, non-repetitive process. While the non-repetitive process can be shown in an individually independent discrete format, the repetitive process can be shown in a repetitive format as the work stage continues to repeat. Thus the study attempts to deal with the two different types of construction process separately. |