Title A Method of Evaluating and Selecting Alternatives of Temporary Facility Planning in High-rise Building Projects
Authors Jang Myung-Houn ; Lee Hyun-Soo
Page pp.143-150
ISSN 12269107
Keywords Temporary Facility Planning ; Vertical Transportation Planning ; Site Layout Planning ; Temporary Facility ; High-rise Building Projects
Abstract The high-rise building construction field in the urban area is short of working space because it is surrounded by adjacent buildings and nearby roads. The insufficient space causes problems of interference and conflicts in transporting materials and working at the site. These problems can be resolved through the proper selection and layout of temporary facilities. The objective of this paper is to develop a method of evaluating and selecting alternatives of temporary facility layout planning in high-rise building projects using AHP(Analytic Hierarchy Process). The method supports a decision-maker to evaluate and select the alternatives of temporary facilities plans by establishing and analyzing processes and influence factors of them. Construction duration and costs are used as criteria that objectively evaluate the alternatives of temporary facilities plans. Case studies are performed to evaluate the feasibility and applicability of the proposed method.