Title A Tact Planning and Scheduling Process Model for Reduction of Finishing Work Duration in Building Construction Projects
Authors Kim Young-Jae ; Han Ju-Yeon ; Shin Dong-Woo ; Kim Kyung-Rai ; Kim Chang-Deok ; Seo Sang-Wook
Page pp.161-168
ISSN 12269107
Keywords Finishing work duration ; Duration reduction ; Tact planning and scheduling process model
Abstract Besides cost and quality, time is an important management point in the construction projects. It may be considered a competitive power as well as a cost reduction effect that a contractor shortens as possible the construction duration with keeping the requirement. But in case of investigation into the actual data of construction projects, it is especially highlighted that finishing work duration of domestic construction projects is much longer than that of in other advanced construction industry. Through reviewing the existing literature related to the schedule management and performing the questionnaire survey and the expert interview, this study proposes a process model to manage the finishing work of building construction effectively and also to reduce the required duration of the finishing work. The model consists of three steps. The first step is a basic planning process, the second step is a detail planning process, and the last step is a operation and maintenance process.