Title |
The Influence of Construction Cost by the Variation of Design |
Authors |
Im Chil-Soon ; Lee Gyu-Choul |
Keywords |
Construction Cost ; changes of Drawing ; Contract Modification |
Abstract |
The purpose of this study is to provide information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of Design change and the process of design change and those of the foreign countries of kangwon province were compared and analysed. A local public institution analyzed profit and loss of construction cost by a design change during construction in 0 buildings for 2001 years. Cost is 170,989,000,000 won with 387 cases, and a total ordering number is with design change number total 266 cases among this, and decrease is 2,009,000,000 won with 48 cases in 16,705,000,000 won with 218 cases increase 23.13% (464,000,000 won), loss occurred with 12.42% (249,000,000 won) the profit that occurred in an enforcement document of construction cost during decrease contents. |