Title |
A Method of Estimation of Working Time Using MOST System |
Authors |
Chae Soung-Ho ; Kim Hyung-Eun |
Keywords |
MOST system ; productivity ; estimation ; wood partition work |
Abstract |
The purpose of this paper is to investigate the effectiveness of MOST(Maynard Operation Sequence Technique)??system in construction works. The work-motions were analyzed by the MOST system and the equations for presumed working time were proposed. This paper is based on actual data collected from wood partition works and all works are video taped on site. Productivity of actual and MOST system based prediction are evaluated with actual data. The accuracy of the results made from MOST system was investigated by compare with actual productivity, and found the small difference. Correlation between actual productivity and that of MOST system was evaluated. Then, adding factors of learning curve, one of the causes for the difference was to improve the results from the MOST system. |