Title The Estimation of Construction Costs by Adopting the EVM Method on the Apartment Housing
Authors Lee Man-Hee ; Lee Hak-Ki
Page pp.147-154
ISSN 12269107
Keywords Earned Value Management ; Estimate At Completion ; Cost Performance Index ; Schedule Performance Index ; Contingency
Abstract With the contingency results obtained at the early stage of the projects, this study for the control of the contingency recognized as a potential risk in the projects demonstrates the best way to anticipate the EAC by utilizing the regression analysis, and then confirms the adequacy under the case studies. The result of this study is following (1) The performance index can't be accepted through all of the projects because of the existing EAC method's limitation to measure it only at a single point of the projects. (2) This research makes the decision makers get the information as much as they want to collect on the basis of the fact to suggest a range of the fluctuation with the three results such as lower, average, and upper limit, not the single value of the EAC. (3) Each case study, reflecting the similar features in the early state of the projects, passes through the processing of regression analysis, and then the contingency can be estimated. (4) The simultaneous regression equations on both ACWP and BCWP can be developed by collecting the actual data about cost and time of the projects by the time to measure the performance index. (5) Consequently, the reports of the fluctuating range of the EAC are able to be on the desk of the decision-makers after estimating CPI and SPI with the expected ACWP and BCWP.