Title |
Feasibility Study of Application BIM Simulation System to Mock-up Site |
Authors |
Jang Se-Jun ; Yun Seok-Heon ; Yun Jun-Seon ; Peak Joon-Hong |
Abstract |
Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator‘s satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. |