Title |
Order Point Determination Method Considering Materials Demand Variation of Construction Site |
Authors |
Lee Jae-Myung ; Yu Jung-Ho ; Kim Chang-Duk ; Lee Kwang-Jae ; Lim Byung-Su |
Keywords |
Materials Management ; Optimal Order Point ; Weekly Schedule ; Dynamic Materials Information |
Abstract |
Inventory management is an important factor for cost saving in a construction project. but current materials management of construction project is difficult to predict the required with occurrence of unexpected situations. if accurate demand forecasts of materials before the fact is possible, materials management will be efficient, stock cost and order cost will be decreased. This study analyzed data generated during the work process in the construction site. Through this, we show materials information management model that follow the change construction schedule meet the change materials demand. Moreover, We suppose that the propriety order time of materials use the collected information. |