A Study on Estimating Construction Period Model based on Fuzzy Logic - Focused on Risk Weight in Project - |
Authors |
Cho Sung ; Cho Yong ; Bang Kwang-Soo ; Yun Seok-Heon ; Paek Joon-Hong |
Keywords |
Fuzzy Logic ; Risk Weight ; Estimating Construction Period ; Decisive Risk Factor |
Abstract |
The purpose of this study is to propose Risk Weight model based on Fuzzy Logic in Decisive Risk Factor during Estimating Construction Period. this study introduce efficient estimating construction period model by applying risk factors to existing construction duration models. Risk factor, however, is unpredictable, so this study applies 퍼지 logic to efficiently predict risk factors. By using Fuzzy logic, risk factors can be quantified, and it is the difference between this study and existing construction duration models. According to having referenced idea as describe above, this paper will be studied by this process. First, trends of estimating construction period is researched and the present condition of them in steps of Fuzzy logic is researched. Second, decisive risk factor and appropriate construction period are derived. Third, Estimating Construction Period Model is proposed by Fuzzy logic. Fourth, Result based on Fuzzy logic is compared with former case. |