Title |
A Case Study on the Educational Facility Project for the Improvement of Work Item’s Structure in BoQ |
Authors |
Noh, Hae-Ra ; Yun, Seok-Heon |
DOI |
https://doi.org/10.5659/JAIK_SC.2017.33.8.47 |
Keywords |
Work Item ; Bill of Quantities(BoQ) ; Simplification ; Work Package |
Abstract |
BoQ(Bill of Quantities) has been commonly used for the cost estimation in construction project. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices. |