Title CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager
Authors Yang, Jin-Kook ; Hong, Seong-Wook
DOI https://doi.org/10.5659/JAIK_SC.2020.36.3.129
Page pp.129-134
ISSN 1226-9107
Keywords Construction Manager(CMr); Construction Management Evaluation; Critical Success Factor; In-depth Interview; AHP Technique
Abstract The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.