Title |
Restructuring the Work Process of Design Change according to the Design Defects in Construction Projects |
Authors |
남경우(Nam, Keong-Woo) ; 김종협(Kim, Jonghyeob) ; 장명훈(Jang, Myunghoun) |
DOI |
https://doi.org/10.5659/JAIK.2022.38.8.269 |
Keywords |
Design Defect; Design Change; Process |
Abstract |
In Korea, participants in the construction phase of public sector construction projects refer to the procedures of public organizations and
perform design changes in accordance with administrative rules. However, there are differences between these documents in form, structure,
and elements depending on the purpose of the enactment, so it is confusing for practitioners to carry out design change works. Therefore, in
this study, the design change process in the existing literature was analyzed for design change due to design defects, which account for the
highest proportion of design change cases, and then the process was systematically restructured. In order to review the adequacy of the
reconstructed design change process, an interview with experts was conducted. As a result, the opinion was investigated that the problems of
duplication, omission, and conflict in the existing design change process were resolved. It is expected that the results of this study can be
used as basic data when revising laws in the future. |