Title |
Analyzing Key Management Factors During the Construction Phase of Modular System-based Buildings With IPA Method |
Authors |
김성은(Kim, Sung-Eun) ; 임형철(Lim, Hyoung-Chul) |
DOI |
https://doi.org/10.5659/JAIK.2024.40.2.285 |
Keywords |
모듈러건축, 인증제도, 관리요인, 우선순위 종합점수지수, IPA |
Abstract |
In the construction industry, modular construction methods are acknowledged as having significant potential both domestically and
internationally. To invest in modular construction, acquiring technological capabilities and policy support is deemed necessary. This study
examines certification systems and regulations for modular construction in domestic and international contexts. By reviewing previous studies,
this research categorizes the modular construction process into four stages of planning and design, transportation, construction, final
completion and inspection and identifies factors to manage at each stage. In conclusion, obtaining reference materials and prioritizing key
management factors in domestic modular construction certification systems and regulations is essential. Moreover, minimizing unnecessary
management factors across each stage, from planning to inspection, is crucial for effectively utilizing information in the future development of
the modular construction industry. |