| Title |
Development of Model Transformation Logic for Discrepancy Detection between P&ID and BIM of Process MEP System for Improved Construction Integrity |
| Authors |
김병연(Kim, Byeongyeon) ; 김선혜(Kim, Sean Hay) |
| DOI |
https://doi.org/10.5659/JAIK.2026.42.2.371 |
| Keywords |
Piping and Instrumentation Diagram; Building Information Modeling; Level of Development; Model Transformation; Approved for Construction; Mechanical Electrical and Plumbing |
| Abstract |
This study is a proactive research effort to develop a solution that automatically detects discrepancies between P&ID and BIM for improving
construction integrity in high-tech facilities such as semiconductor FAB. First, we analyzed and categorized discrepancy cases reported during
the AFC (Approved for Construction) phase. We then proposed the necessary modeling guideline and details for P&ID and MEP BIM, and
finally, to align the model specification, model resolution and system context between P&ID and MEP BIM, we proposed logic and
conditions of P&ID2NET and BIM2NET model transformation suitable for domestic high-tech construction sites. |