Title A Study On the Scheduling Method of Multi-Building Construction
Authors 이두진 ; 최민권
Page pp.259-266
ISSN 12251674
Abstract The purpose of process planning is to minimize the total duration of building construction.Multi-site scheduling method is one of the solution of it. But, to use the Multi-site scheduling method, we must synchronize the time of each job. For this reason, Building Structure must be limited. In this paper, put into a formula to calculate the scheduling in the case of Multi-Building Construction without the limitation of the structure.