Title |
Reliability of Power System Included Distributed Generation Considering Operating Strategy |
Abstract |
Using DG for peak-shaving unit could reduce the overall system operating cost, and using DG for standby power unit could improve the reliability of the distribution system. The models of peak-shaving unit and standby power unit are different from each other. The Monte-Carlo simulation is suitable for the purpose of the analysis of two DG models. In this paper, the reliability indices are calculated from the time-sequential method, and the merit and defect of the peak-shaving unit and standby power unit are investigated |