Mobile QR Code QR CODE : Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

ISO Journal TitleJ Korean Inst. IIIum. Electr. Install. Eng.
Title A Consideration on 3-Phase Non-Loop, Multiple-Point Ground Method in 22.9[㎸] CNCV Underground Cable Systems
Authors Myung-Su Jeon ; Joong-Ho Song
Page pp.85-93
ISSN 1225-1135
Keywords Corculatlng current in co-axial neutral lines of distribution cables ; Multlple-point ground ; Non-loop multiple-point ground ; Induction interference ; Tolerant Current of cables
Abstract In 22.9[㎸]-y distribution systems, underground cables are provided with 3-wire loop multiple-point ground in which each coaxial-neutral line of the distribution cable lines(A, B, C phases) is 3-wire common grounded at every connecting section. In the underground cable distribution systems, circulating current flows in the coaxial-neutral lines and its magnitude amounts to about 40~50[%] load currents, even though loads are balanced. This paper presents a new ground method to overcome such a problem and a comprehensive analysis in terms of current capacity of power cables, induced voltage of cable sheath, and electromagnetic interference voltage from power cable lines.