Title The Application and Seismic Design Method of Electrical Facility Installed in the Building
Authors Gi-Hyun Kim ; Sang-Ick Lee ; Suk-Myong Bae ; Sung-Gook Cho
Page pp.74-79
ISSN 1225-1135
Keywords Earthquake ; Seismic Design ; Electrical Facility ; Transformer Vault
Abstract In the case of that not considered seismic design at transformer vault which is equipped with many important electrical facilities, the facility is damaged, electrical fire breaks out and another damage may be caused due to earthquake. But seismic design has not yet applied to transformer vault in the country. Regard to seismic design method of electrical facility installed inside the building, the seismic design procedures for electrical facility is presented in this paper, which has been developed by referring “Building design standard” of domestic code and “Manual of seismic design and construction for building electrical facility” in japan. This paper may help engineers perform detail seismic design, construction and reliability inspection of electrical pipes and facilities.