Title |
The Realiztion Methods of IEC 61850 Based 154[kV] Substation Automation System in KEPCO System |
Authors |
Hak-Yong Kim ; Jeong-Yeol Han ; Nam-Ho Lee ; Byeong-Heon Kim ; Nae-Ho Park ; Jung-Woo Hong |
DOI |
http://dx.doi.org/10.5207/JIEIE.2010.24.5.086 |
Keywords |
IEC 61850 ; Substation Automation System ; Intelligent Electronic Device ; Generic Object Oriented Substation Event ; GIS |
Abstract |
This paper presents the guideline for enhancing the reliability and availability of SAS with IEC 61850 based IEDs in real power system. The IEC 61850 standard communication networks and systems allow utilities to consider new designs for substations applicable both new substation and refurbishments. The existing solutions are based on hardwired interface between the primary substation equipment and the secondary protection, monitoring, control and recording devices. All over the world, lots of projects at different stages of realization have been reported during the last year leading to a rapid maturation of the associated technologies. At present, IEC 61850 is becoming a popular communication standard for the substation automation system. |