Title |
A Consideration of the Expected Service Life Cycles of Electrical Equipments in Buildings |
Authors |
Jong-Wook Jeong ; Sun-Gu Kim |
DOI |
http://dx.doi.org/10.5207/JIEIE.2010.24.12.131 |
Keywords |
Deteriorated Power Equipments ; Domestic·Foreign Case Studies ; Life Cycles |
Abstract |
This paper considers and suggests the life cycle of the power equipments installed in buildings. The target equipments were divided into 5 groups by a couple of conditions, and a theoretical consideration and domestic?foreign case studies were carried out. As a result, the most appropriate life cycles and monitoring periods were suggested for each group. The suggested results are expected to practically help the field electricians determine whether they have to replace the deteriorated equipments or not. |