Keywords Superconducting Fault Current Limiter (SFCL) ; KEPCO Grid ; Protection Coordination
Abstract In this paper, the protection coordination of the protection devices such as the over-current relay (OCR) and recloser (R/C) with superconducting fault current limiter (SFCL) was investigated in a KEPCO grid. The operation time and protection coordination of the protection devices were changed by the SFCL. Through the analysis for protection coordination between the SFCL and the protection devices in the KEPCO grid, the operation time was observed to depend on the impedance of the SFCL.