Mobile QR Code QR CODE : Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

ISO Journal TitleJ Korean Inst. IIIum. Electr. Install. Eng.
Title Development of Single Phase Cabinet Panel with Electrical Safety Monitoring System by
Authors Gi-Hyun Kim ; Sang-Ick Lee ; Seong-Su Shin ; Suk-Myong Bae
DOI http://dx.doi.org/10.5207/JIEIE.2011.25.7.092
Page pp.92-96
ISSN 1225-1135
Keywords Electrical Safety Monitoring System ; Cabinet Panel ; Traditional Markets ; Mobile
Abstract In this paper, in order to reduce the electrical disaster such as electrical fire at traditional markets, we need to develop the ESMS(electrical safety monitoring system) which is able to monitor the power status of electrical equipments. Therefore, for solving the those problems, we developed the detection censor(ZCT, CT) and equipment of data analysis and transmission. The detection censor and equipment are able to monitor the electrical equipments condition(over current, leakage current, arc, etc.). We constructed Test-Bed for testing reliability of the ESMS and obtained certification. And we tested the over current, leakage current and arc under the normal condition.