Title Development of Start?Stop Control System at Water Turbine Generator for Tidal Power Plant
Authors Byong-Og Cho ; Chul-Won Park
DOI http://dx.doi.org/10.5207/JIEIE.2014.28.6.106
Page pp.106-112
ISSN 1225-1135
Keywords Dynamic Simulation ; Efficient Operation ; Maximum Power ; Sihwa Tidal Power Plant ; SCADA ; Start?Stop Control System ; 2D Simulator ; Water Turbine Generator
Abstract Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start?stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start?stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.