Mobile QR Code QR CODE : Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

ISO Journal TitleJ Korean Inst. IIIum. Electr. Install. Eng.
Title A Study on Evaluation of Optimal Replacement Period by Reliability Prediction for the Door Control Relay of EMU
Authors Jaehyun Han ; JongWoon Kim ; JeongSeo Koo
DOI http://dx.doi.org/10.5207/JIEIE.2014.28.7.034
Page pp.34-40
ISSN 1225-1135
Keywords Aged Replacement ; Minimal Maintenance Cost per Hour ; Bayes' Theorem
Abstract In this paper, we want to know the optimal replacement cycle(time) for this study was performed. The optimal preventive replacement age can be fond by finding the value of time that minimizes the cost function(model of Barlow and Jardine). In addition, The reliability of the relay according to the service environment were studied. The use of the exchange relay period is longer, and maintenance cost rate(per hour) may increase, and also the reliability may cause a decline. In addition, considering the preventive maintenance and purchase order, a representative relay(RAX-L440-A type) life was calculated.