Title |
A Study on the Operation of Distribution System for Increasing Grid-Connected Distributed Generation |
Authors |
Won Nam-Koong ; Moon-Jong Jang ; Sung-Woo Lee ; Dong-Wan Seo |
DOI |
http://dx.doi.org/10.5207/JIEIE.2014.28.9.083 |
Keywords |
Over Voltage ; Normal Open Point ; Network Reconfiguration ; DG |
Abstract |
When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network. |