Title |
Influence Analysis of 154kV Substation Using Time-Synchro Phasor Data |
Authors |
Kyung-Min Lee ; Chul-Won Park |
DOI |
http://doi.org/10.5207/JIEIE.2024.38.4.288 |
Keywords |
High-precision monitoring system; Influence analysis; Instantaneous voltage change rate; PMU; Statistical technique; Substation; Time synchronized-phasor data |
Abstract |
KEPCO installed 35 PMUs at the 154kV Yeonggwang substation in Jeollanamdo through an integrated control system construction and verification project in the renewable power generation area. Measures and research are in progress to install multiple PMUs in a substation and easily utilize the vast amount of time-synchronized phasor data obtained from them. |