(2013), CM at Risk delivery method in US public buildings, Korea Journal of Construction
Engineering and Management, KICEM, 14(4), 69-72.
(2014), Building partnerships: case studies of client-contractor collaboration in
the UK construction industry, Construction Management and Economics, Taylor & Francis,
18(7), 819-832.
(2011), Developing a fuzzy risk assessment model for guaranteed maximum price and
target cost contracts in construction, Journal of Facilities Management, Emerald,
9(1), 34-51.
(2006), The Trend of CM at Risk in the U.S Construction Market, Korea Journal of
Construction Engineering and Management. Choi, E. J. (2012) The lowest bidder ‘irrational’
70%, Consensus on introducing the best value, Construction Industry Research Institute
Of Korea
(2012), The lowest bidder ‘irrational’ 70%, Consensus on introducing the best value,
Construction Industry Research Institute Of Korea
(2006), The US CMR market - Analyze its characteristics and trends
(2007), The Problem Analysis and Improvement Plans to the Bidding System of Construction
Works, Korea Journal of Construction Engineering and Management, 806-811.
(2011), Pre-project peer reviews in GMP/lump sum contracts, Engineering, Construction
and Architectural Management, Emerald, 16(2), 175-185.
(2014), Schemes to Strengthen Competitive Power of Domestic Specialty Construction
Contractors by Activating CM at Risk, Journal of the Regional Association of Architectural
Institute of Korea, KJCR, 16(6), 207-214.
(2006), Introduction of CM at Risk in Public Construction Ordering
(2010), Development on Standard Process of Pre-construction phase for Overseas Plant
projects, International Journal of Air-Conditioning and Refrigeration, World Scientific(6),
806-811.
(2015), Competitiveness prognosis and policy Implications of Korean Construction
Companies’ overseas construction