JIEIE
Journal of the Korean Institute of Illuminating
and Electrical Installation Engineers
KIIEE
Contact
Open Access
Monthly
ISSN : 1229-4691 (Print)
ISSN : 2287-5034 (Online)
http://journal.auric.kr/jieie
Mobile QR Code
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
ISO Journal Title
J Korean Inst. IIIum. Electr. Install. Eng.
Online Submission
Main Menu
Main Menu
About Journal
Journal Archive
Aims and scope
Editorial board
Instructions to authors
Research Ethics Regulation
Contact info
Online-Submission
Journal Search
Home
Archive
2020-08
(Vol.34 No.08)
10.5207/JIEIE.2020.34.8.033
Journal XML
XML
PDF
INFO
REF
References
1
Lee Nam Ho, Jang Byung Tae, 2010, Development of IEC 61850 Client Testing System for Verifying the Communication Conformance of Substation Automation, JIEIE
2
Apostolov Alex, 2008, We can not test 21st century IED with 20st century testing technology, Pac world winter
3
Vandiver Benton, Bharadwaj , 2019, Improved Protection and Control Testing Utilizing IEC 61850, Pac world winter
4
UCA IUG , 2019, IEC 61850 Interoperability Testing Final Test Report, UCA
5
Hinkley Kevin, Mistry Chirag, 2018, First digital substation in Transgrid, IET journals
6
Stensrud Linda, Ohrn Bendik, Rannveig.S.J.Loken , Hurzuk. Nargis, Apostolov Alex, 2018, Testing of Intelligent Electronic Device(IED) in a digital substation, IET journals
7
Kunz Guilhereme, Machado Jos’e, Perondi. Eduarado, Vyatkin Valeriy, 2017, A Formal Methodology for Accomplishing IEC 61850 Real-Time Communication Requirements, IEEE Transactions on Industrial Electronics, Vol. 64, No. 8
8
IEC 61850-6 , 2009, Communication network and systems for power utility automation- Part6: Configuration description language for communication in electrical substation related to IEDs
9
IEC 61850-7-3 , 2010, Communication network and systems ifor power utility automation Part7-3: Basic communication structure for substation and feeder equipment-Common data classes
10
IEC 61850-7-4 , 2010, Communication network and systems for power utility automation- Part7-4: Basic communication structure for substation and feeder equipment-Compatible logical node classes and data classes
11
IEC 61850-8-1 , 2011, Communication network and systems for power utility automation- Part8-1 Specific communication service mapping (SCSM)-Mapping to MMS
12
IEC 61850-10 , 2012, Communication network and systems for power utility automation-Part10 Comformance Testing
13
UCA IUG , 2009, Conformance Test Procedures for client with IEC 61850-8-1 interface Revision 1.1
14
UCA IUG , 2018, Conformance Test Procedures for client with IEC 61850-8-1 Edition2 interface Revision 1.1.1