Title Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling
Authors Choi, Yoon-Ki ; Lee, Hyun-Soo ; Hwang, Young-Sam ; Kim, Young-Suk ; Kim, Woo-Young ; Song, Young-Woong
Page pp.153-161
ISSN 1229-7534
Keywords Construction Project Control System ; Integrated Cost and Schedule ; Process and Data Modeling
Abstract The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost , schedule database.