Title |
Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology |
Authors |
Kang, Woo-Young ; Chin, Sangyoon ; Kim, Yea-Sang |
Keywords |
Progress Management ; Daily Report ; Task Information ; Mobile Technology ; Information System ; Information Management |
Abstract |
As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements. |