Title Problems Analysis and Revitalization Plan of Urban Development Projects by the Land Readjustment Method
Authors Kim, Hyoung-Soo ; Lee, Young-Dai ; Lee, Jun-Yong
Page pp.37-46
ISSN 1229-7534
Keywords urban development plan ; AHP ; land readjustment planning ; urban development projects ; revitalization ; effective land use ; land readjustment method
Abstract This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIF8), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1; cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.