Title A Study on the Method for the Estimate of Construction Managemnet in the Program Management
Authors Baek, Myeongchang ; Park, Junmo ; Park, Gilbeom ; Kim, Okkyue
DOI http://dx.doi.org/10.6106/KJCEM.2014.15.5.003
Page pp.3-12
ISSN 1229-7534
Keywords Program management ; Cost Estimation ; Typical Model ; Characteristic Factor
Abstract With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.