Title A Study on Normal Project Duration for Water Resource Project
Authors Lee, Bongsu ; Kim, Kinam ; Lee, Minjae
DOI http://dx.doi.org/10.6106/KJCEM.2015.16.1.035
Page pp.35-43
ISSN 1229-7534
Keywords Normal project duration ; Historical data ; Regression model ; Water resource
Abstract It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.