Title Development of Active 5D CAD System for Replaning Progress Schdeule According to Change of Project Cost
Authors Kim, Hyeonseung ; Kang, Leenseok
DOI http://dx.doi.org/10.6106/KJCEM.2016.17.5.054
Page pp.54-61
ISSN 2005-6095
Keywords 5D CAD ; Optimization ; Cost Simulation ; Construction Cost ; BIM
Abstract The initial planned annual cost is frequently adjusted under the construction process in construction projects. If the annual cost is reduced than the initial planned cost, the number of possible activities is also reduced from initial planned progress schedule. In such cases, project manager need to replan the progress schedule with possible activities within changed annual cost. However, most project manager will proceed as planned schedule without any change. After the project cost has been exhausted, there are many cases to stop the operation of the construction site. This study developed active 5D CAD system that can replan the progress schedule within changed annual cost and simulate the cost status according to the changed schedule for cost visualization. This system can be used as a decision-making tool in the replaning progress schedule and will be able to inrcease the practical usability of 5D CAD system.