Title |
Developing an Owner’s Project Evaluation Framework for Construction Management |
Authors |
Kim, Jonghoon ; Lee, Hyun-Soo ; Park, Moonseo ; Park, Sanghyuk ; Lee, Inbeom |
DOI |
http://dx.doi.org/10.6106/KJCEM.2016.17.5.130 |
Keywords |
AHP ; CSF ; PDRI ; Project Evaluation Form |
Abstract |
Owner’s participation on a construciton project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evalaution form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects. |