Title |
Lifting Work Process Optimization Method in High-rise BuildingC onstruction Through Improvement of CYCLONE Modeling Method |
Authors |
Hawng, Doowon ; Kwon, Okyung ; Choi, Yoonki |
DOI |
http://dx.doi.org/10.6106/KJCEM.2017.18.2.058 |
Keywords |
Improvement of CYCLONE Modeling ; Work Process ; Construction Lfit ; High-rise Building |
Abstract |
The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated asis lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed. |