Title Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management
Authors Kim, Yongpyo ; Lee, Yongjun ; Lee, Minjae
DOI http://dx.doi.org/10.6106/KJCEM.2017.18.5.032
Page pp.32-40
ISSN 2005-6095
Keywords Work Package ; Progress Management ; Work Breakdown Structure ; Field Schedule Management
Abstract Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.