Title A Study on Estimating Time for PRD (Percussion Rotary Drill) Pliing Work
Authors Kim, Yong-Gyu ; Choi, Chang-Hoon ; Han, Choong-Hee ; Lee, Junbok
DOI http://dx.doi.org/10.6106/KJCEM.2018.19.3.003
Page pp.3-10
ISSN 2005-6095
Keywords PRD ; Pile Driver ; Piling Works ; Estimating Work Time
Abstract In recent years, mechanized construction has become commonplace due to increases in the scale and complexity of construction, and construction machinery is a major factor in successful construction. However, even though the proportion of construction machinery is increasing, analysis of the work capacity of construction machinery is inadequate. In addition, since the standards for all construction machines are currently not defined in quantity-perunit, the construction period is arbitrarily applied according to the operator at the time of the construction plan. As a result, the construction period of the actual construction is insufficient, and rushed work or construction delays occur. Therefore, in this study, in order to calculate the construction period of the piling work of the pile driver used in the PRD method more accurately than the existing method, the formula for calculating the time required for the piling work of the pile driver was established by collecting piling time data from the daily task reports through the field survey. If the precise construction period of piling work is estimated based on the results of this study, it will be possible to prevent the rushed work and construction delays that occur duet o the short construction period.