Title Data-driven Interactive Planning Methodology for EPC Plant Projects
Authors Wang, Hankyeom ; Choi, Jaehyun
DOI http://dx.doi.org/10.6106/KJCEM.2019.20.2.095
Page pp.95-104
ISSN 2005-6095
Keywords Interactive Planning ; EPC Plant Construction ; Planning and Scheduling ; Work Package ; Asset Data
Abstract EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.