Title |
A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using PROMETHEE-AHP |
Authors |
Yoo, Seung-Min ; Kwon, Oh-kyung ; Choi, Yoonki |
DOI |
http://dx.doi.org/10.6106/KJCEM.2019.20.3.077 |
Keywords |
Apartment ; Reconstruction ; Remodeling ; Selection Factor ; PROMETHEE-AHP Method |
Abstract |
Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method and PROMETHEE method used for analysis of relative importance and impact values regarding to the business selection. |