Title Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad
Authors Yoon, Chang Geun ; Park, Su Yeul ; Kim, Seok
DOI https://dx.doi.org/10.6106/KJCEM.2020.22.6.131
Page pp.131-137
ISSN 2005-6095
Keywords Track Exchange; Risk Reduction; Work Plan; Standard Work Process
Abstract Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.